Freeway construction has prompted yet more Fort Worth road closures. From 9 p.m. Monday Nov. 23 through 5 a.m. Tuesday Nov. 24, motorists can expect:
· All lanes of eastbound Loop 820 at the Interstate 35W/Loop 820 interchange will be closed. Traffic will be redirected to Meacham Boulevard.
· The direct connectors from northbound and southbound I-35W to eastbound Loop 820 will be closed. Traffic will be redirected to Meacham Blvd.
· All lanes of eastbound Texas 121 at I-35W will be closed. Traffic will be redirected to Fourth Street.
· All lanes of southbound Texas 121 at I-35W will be closed. Traffic will be redirected to Carver Avenue.
· The direct connector from southbound Texas 121 to southbound I-35W will be closed. Traffic will be redirected to Carver Avenue.
· The two right lanes of northbound I-35W at Spur 280 will be closed.
The construction is part of the $1.4 billion North Tarrant Express 35W project. Included is a section ranked sixth on the state’s most congested roadway list along 6.5 miles of I-35W from north of Interstate 30 to north of Loop 820 including the I-35W/820 interchange in Fort Worth. The project includes the reconstruction of main lanes and the addition of TEXpress managed lanes.
More information is available at www.northtarrantexpress.com.